The Big Slough Channel Restoration
The Big Slough Channel Restoration consisted of 300 LF of channel excavation. We used R-200 to stabilize the East & West banks of the channel. We are proud to serve the U.S. Corps of Engineers.
The Big Slough Channel Restoration consisted of 300 LF of channel excavation. We used R-200 to stabilize the East & West banks of the channel. We are proud to serve the U.S. Corps of Engineers.
Polk & Associates was the selected contractor by the U.S. Army Corps of Engineers to complete the Arkansas Levee Resurfacing Project. The work consisted of 22.61 miles of levee resurfacing and used 59,655 tons of stone.